Agree, don’t under estimate the NAP 250 
1 Like
…boogie factor 
1 Like
That’s a good point Claire…full Fraim (set up properly), power line, dedicated spur, switch less sockets…maybe that’s what’s needed to enable the 250DR to really show its stuff with the Nova? ![]()
This topic was automatically closed 60 days after the last reply. New replies are no longer allowed.