Naim kit at this level is all made to order in the factory, so, if ordering within the UK you should expect a wait of anywhere from 4-8 weeks, although it could be longer if demand is high or if any part supply is experiencing delay. As ever, your dealer will have the best information available. I’m sure any wait will be well worth it though.
I am not too unhappy about waiting, I know these things take time, but if I had an approximate date I’d forget about it and just enjoy the music, which is fab, even with the Atom as pre-amp.
@back_in_the_game i looked at your system profile. I too started out without the power supplies. When I finally purchased two, they made a very significant difference. Consider them when you have funds available. I also found the NC series to benefit from better cables. However I started out with the standard Naim interconnects.
My 350s took about 5 weeks from placing the order. But, i did ask my dealer up front for a realistic date. Naim should be able to do this with their dealers.
You are more patient than me. I would never wait that long for anything Hifi (especially if it is available from a dealer). Its not that Naim are exactly Artisan manufacturers.
The OP asks an interesting question. In ‘old world’ manufacturing they’d probably have shelves full of stock that could be sent out to the retailer immediately. The trouble is that this ties up stock and cash flow. More modern manufacturing suggests ‘single piece flow’ is the key. This is where the customer orders the item and it’s made immediately, probably in several stages by individuals carrying out as many of the build tasks as possible.
Whilst this can be extremely efficient it requires quite sophisticated orchestration to ensure the build quality is perfect at every stage, rather than when it reaches a soak test. Production flows can be quite fascinating and can take quite complex mathematical formulas to get absolutely right. However, when successful they can save a company an absolute fortune.
I had a simple target, save the company three times my annual salary and I’d get to carry on working for another year. This was actually pretty easy and in the five years I headed up the ‘production flow department’ I saved the company around £12m.
Interesting. I had no idea it was so challenging. As with anything it takes a lot of organisation and method to get out a product of the quality that we expect and yet we ignore or dismiss the various stages that are involved.
my brother in law often dismisses manufacturing. He just highlights the numbers with tiresome quotes like “it costs X company X amount of money to produce a product and they are ripping people off selling for X amount”. Completely ignoring everything that’s required in designing and building products.