Yes done that but there really is nothing that addresses the specific constraints. 6 shelves across 2 side by side racks, with a mezzanine for smaller components and the power amp having to be in a fixed position. For example the 555ps ought to be on the power left rack and the nDac on the right but that puts their burndy connections as far apart as they can be. The 282 should be top right ideally but that’s a long stretch for the connection to the 250.
But please feel free to post a link to an appropriate thread. I could easily have missed something.
I also asked AI but that gave really stupid suggestions like putting the nDac on top of the 555ps.
I wasn’t being mardy just didn’t know if you had had a chance to. check other threads.
I am sure some clever peeps will be a long with lots of suggestions in a bit. Good luck with your experimentation and I look forward too reading your experiences.
( I have a similar set up as yours it seems except mine is a single two stack rack each with 5 levels. - and its all full )
No probs.
I’m thinking I’ll go left top down, CD5xs (using digital out to nDac so hopefully not too much interference), 555ps, hicap and nspsc2 on mezzanine then 250 dr on bottom.
On left from top 282 (hopefully it’ll reach), nDac, nd5xs2.
Airlink will be on floor or a granite slab behind right speaker.