I had a couple of quite long chats about this with Steve Hopkins when he was Naim’s customer service manager. His recommendations were based on my actual system at the time, which he was aware of, and distance from the consumer unit.
He also mentioned that they had experimented quite a lot when wiring the main demo room, and his recommendations were based largely on that, plus other installations he had done subsequently.
Steve made a number of suggestions, but the main ones that, when I pressed him, he insisted should not be avoided, were:
- Use a separate consumer unit run by splitting the meter tails.
- Use a single 10mm cable for the whole system.
We did not, I admit, discuss earthing arrangements, beyond him briefly mentioning that while a TT arrangement may be best, it was probably outside the bounds of what was practically achievable in most homes.