Listened to the NC 222 with NC 250. Very nice. But then of course you have to add the NC 300 because adding it sounds better. I know though I need to replace my ageing 272. So it seems the obvious path to take. Perhaps we should negotiate a bulk deal?
By all means negotiate on our behalf! I think I am just going to audition the 222/250 as an upgrade from Nova. The 2 boxes on their own at Ā£12400 really ought to be a major improvement on the Ā£4300 Nova. If it takes a Ā£6k PS to make it all sing then something has gone v wrong and Iāll hang on to my Nova!
I should have said āa bit betterā. Iāll see if I can get a BOGOF.
Congratulations!!
Are you doing something special today to celebrate?
Thanks David. Spent the day out and about, listened to some (possible) new boxes for the system (new classic). Tomorrow a haircut, a trip up to the viewing platform at 8 Bishopsgate (free by the way). Then lunch with my wife. Itās all go!
Cheers on the procrastination. I have ruled my life by this, and trained my offspring to do the same.
The main rule being: NEVER do anything today that could possibly be put off till tomorrow. Sage words.
98% of the time, when tomorrow comes I find that it didnāt need to be done, or it was actually really good that I didnāt do it, or someone else did it and it would have been done twice, or it just didnāt matter either way, but a person with OCD wouldnāt not have been able to do it.
Owned and operated a very successful business for 18 years respecting this principal.
That sounds great, Badger, warms my heart ā¦
Laughed at that one!
I might put off replying until tomorrow if you donāt mind
Show-off!
Man ā¦ you guys are all hilarious today, Iāve been laughing all thru these posts.
Is there something in the water today?
I do like a cold beer on a hot day.
But I guess it was a clumsy way to write metres, Iāll do better next time sir
Yes it does make a change from some of the deadly serous threads.
Just had good news our concreterās other project had been placed on hold and as a result weāll have our ground floor slab poured next week. Thatās at least 5 weeks ahead of schedule.
Thatās huge. Usually in building projects, itās delay after delay. Someoneās looking after you.
Yes Mr C. Ash,
Yeppie Mrs Peteās just got the ok to drive again, Iām on the way to the pub now.
Judging by the lean of the photo youāre still recovering from last night.