Kudos Active day with Cymbiosis

Ah, got it.

Very nice - just shows that going active doesn’t mean a massive amount of boxes are needed. That’s a fairly discreet system.

Sounds like it was an interesting day :sunglasses:

1 Like

Ah thanks Nigel, now corrected - what would we do without you…

That’s an interesting equipment stand, Fraim like in design but not as wide.

@james_n sorry the units were only for display, this is the system active along the top

along the top shelf NDX2/252/SCDR/2 x 250 DR, on next shelf XPSDR/SNANXO/SC - so slightly more black boxes think 8 in total

2 Likes

I see - shame. That’s a lot of boxes in the Naim setup !

yes would ideally need two seperate shelving brian and brawn

This topic was automatically closed 60 days after the last reply. New replies are no longer allowed.